BART trains up to 20 minutes behind schedule due to equipment problem 

click to enlarge BART
  • Cindy Chew/2005 S.F. Examiner file photo
  • BART is experiencing delays Sunday afternoon due to a switching malfunction.

An equipment problem on BART tracks is delaying trains by up to 20 minutes this afternoon, a dispatcher said.

The delay was caused by a switching malfunction on the tracks between Millbrae Station and San Francisco International Airport, the dispatcher said.

The problem was causing trains to be behind schedule between San Francisco and the East Bay on the Pittsburg/Bay Point Line.

Anyone traveling to SFO should allow for extra time, the dispatcher said.

About The Author

Bay City News

Pin It
Favorite

Speaking of...

More by Bay City News

Latest in Transportation

© 2018 The San Francisco Examiner

Website powered by Foundation